Skip to content
Close-up of a cloth tape measure lying on fabric

Quality assurance

Garment Quality Control in Bangladesh: How We Work

Garment quality control, in our framework, means agreeing the standard before production, checking against it at fixed points, and recording what we find in a form you can act on. A final inspection is one part of that plan, not the plan itself: most problems are cheaper to fix at the specification, material or inline stage.

This page describes how we run quality control on orders with our partner factories in Bangladesh. To book a standalone inspection, see quality inspection services. For a general introduction to the subject, read the garment quality control guide.

Our quality workflow

  1. 01

    Specification review

    Tech pack, measurement chart, tolerances, fabric and trim standards are reviewed and gaps raised before sampling.

  2. 02

    Pre-production meeting

    Approved sample, critical points and inspection criteria are confirmed with the factory before bulk cutting.

  3. 03

    Material checks

    Fabric inspection, shade bands, shrinkage and trims are checked against approvals, with lab testing where required.

  4. 04

    Inline inspection

    Early-production checks on the sewing lines to catch workmanship and measurement issues while they can be corrected.

  5. 05

    Pre-shipment inspection

    Random sampling inspection of finished, packed goods using AQL levels agreed in advance.

  6. 06

    Report and release

    A written report with findings and photos; shipment proceeds on your approval or after agreed corrective action.

Our QC philosophy

Five principles guide every quality plan we set up.

The approved sample is the standard
Inspections compare bulk against the approved PP sample and specification, not against general expectations.
Criteria agreed before cutting
AQL levels, tolerances, test standards and packing rules are confirmed in writing before bulk starts.
Inspect early
Material and inline checks catch systemic problems while they can still be corrected.
Report facts
Findings are recorded as they are found, with photos. Results are judged against agreed criteria, not negotiated on the day.
The factory fixes, we verify
The factory owns rework and root-cause action; we check that the fix has worked.

AQL sampling: what it is and how we apply it

AQL, the acceptance quality limit, is a sampling method defined in ISO 2859-1 for inspection by attributes. The lot size and inspection level set a sample size code letter, which gives the number of pieces to inspect. The AQL chosen for each defect class then sets how many defects are allowed before the lot is rejected. Many buyers use general inspection level II, accept no critical defects, and set separate, tighter limits for major defects than for minor ones.

We apply your quality standard where you have one. If you do not, we propose levels suited to the product and confirm them in writing before production. AQL is a statistical sampling plan, not a defect-rate promise: a lot that passes can still contain defective pieces, which is why inline checks matter.

Inspection types

We combine these inspections according to the product, the factory's track record and your requirements.

InspectionWhenWhat it coversOutput
Pre-production checkBefore bulk cuttingApproved samples, materials in house, critical points, inspection criteriaMeeting record and risk list
Fabric and trim inspectionOn receipt of materialsFabric defects by four-point grading, shade, width, GSM, shrinkage, trims against approvalsMaterial report
Inline inspectionOnce early bulk output is availableWorkmanship, measurements, process problems on the linesInline report with corrective actions
Pre-shipment inspectionWhen production is complete and most goods are packedAQL sampling, measurements, labeling, packing, on-site testsPass, fail or pending report
Loading checkAt container loadingCarton count and condition, container condition, seal recordLoading report

Defect classification

Every defect is recorded in one of three classes, using definitions agreed with you before production.

Critical
Could harm the user or breach a legal requirement, such as a broken needle, a sharp edge, or detachable small parts on children's wear. Critical defects are normally not accepted at any level.
Major
Likely to cause a return or affect use or saleability, such as an open seam, an out-of-tolerance measurement, a wrong size label or visible shade variation between panels.
Minor
A departure from the standard that is unlikely to affect use or sale, such as an untrimmed thread or slightly uneven stitching in a non-visible area.

Measurement and packing checks

Beyond workmanship, our inspectors check the points that most often cause claims at the receiving end.

Measurements
Points of measure across sizes against the spec sheet and agreed tolerances, recorded per piece.
Color and shade
Comparison with the approved standard in a light box under the agreed light source.
Functional tests
Seam pull tests, zipper and snap function, and stretch and recovery checks where relevant.
Labels and markings
Care, fiber and origin labels, size labels and hangtags checked against your requirements.
Packing
Folding, polybag warnings, assortment, barcode scan, carton marking, dimensions and weight, carton drop test.
Safety and moisture
Needle detection records where required, and moisture readings on goods and cartons.

Lab testing

Inspection shows what can be seen and measured on site; laboratory testing covers what cannot. Typical tests include colorfastness to washing, rubbing and light, dimensional stability, pilling, tensile and tear strength, seam slippage, pH, and restricted substances against your RSL or market rules. Children's products and some destination markets carry specific legal requirements.

We recommend labs accredited to ISO/IEC 17025 for the methods required, or use the lab you nominate. Testing can be done at fabric stage, garment stage or both; the plan, standards and who pays are agreed with the quotation. Test methods are explained in the fabric guide.

Inspection reports and corrective action

Each report states the order details, AQL plan and sample size, defects found by class with photos, measurement and on-site test results, packing findings, the overall result and the inspector's comments. When a result fails, we follow these steps.

  1. 01

    Notify

    You receive the report promptly, with our view of the cause and the options.

  2. 02

    Root cause

    The factory identifies why the defect occurred and how the process will change.

  3. 03

    Rework or sort

    Affected goods are repaired or sorted piece by piece under agreed supervision.

  4. 04

    Re-inspect

    A new inspection is carried out on the reworked lot, with costs allocated as agreed.

  5. 05

    Decide and record

    You release, accept with a written concession, or reject. The outcome is recorded against the factory's performance history.

Frequently asked questions

Which AQL levels do you use?

Yours, if you have a quality manual. If not, we propose levels suited to the product and market, usually based on general inspection level II, and confirm them in writing before production starts.

Does a passed inspection mean the order has no defects?

No. AQL sampling inspects a statistical sample, so a passed lot can still contain some defective pieces. Material checks and inline inspections reduce that risk by catching problems before the goods are finished.

Who pays for inspections and lab tests?

It depends on the program agreement. Inspection may be included in our service or charged separately, and lab tests are usually quoted per test. Costs are confirmed before production, together with who pays for re-inspections after a failure.

Can my own third-party inspector check the goods?

Yes. We coordinate dates and access for your nominated inspection company and share our inline findings with them, so both sets of results can be read together.

What happens if the final inspection fails close to the shipping date?

We set out the options with you straight away: rework and re-inspection, partial shipment of conforming goods, or a revised date. The decision is yours; we document it and the cost allocation agreed with the factory.

Sources and references

  • ISO 2859-1: Sampling procedures for inspection by attributes, Part 1, International Organization for Standardization (ISO) (Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection.)
  • ISO/IEC 17025: General requirements for the competence of testing and calibration laboratories, International Organization for Standardization (ISO)
  • AATCC test methods, AATCC

Regulations, tariffs and preference schemes change. Always confirm current requirements with the official source or a licensed customs broker.

Ready to source garments from Bangladesh?

Tell us what you need. We review every enquiry personally and reply with next steps, questions or factory options.

Request a Quote